Highway 29 Halfway River Bridge
This $104.6-million construction contract was awarded to Eiffage-Infracon Halfway River Joint Venture. Work includes 3.7 kilometres of new 2-lane highway and the construction of a new bridge crossing the Halfway River that will be 1.0-kilometre long, with 12 piers for support.
Project Site: https://www.sitecproject.com/highway-29-realignment-bridge-replacement-contract-awarded
Project Details
Inline Group was hired by both partners of the Joint Venture to perform materials testing, surveying, and design support on their individual scopes of the project. Our surveyors are responsible for a large range of tasks, including project extents layout, layout and as-builts of various road and bridge components, as well as surveying rebar, anchor bolt, masonry plate and precast panel placements. Back in our head office, our team of AutoCAD Technicians are in constant communication with the field crews as they create layout files, as-built files, and work on various design aspects for the project.
Incredibly large quantities of concrete are being used on this project and it is now our biggest concrete project to date. Both our on-site and in lab Material Technicians are continuously retrieving samples and testing the soil, concrete and asphalt used on the project. Inlineās in-house Engineers have also been tasked with completing Load Plate Testing and reviewing and analyzing the results. Inline is involved in almost every aspect of construction to ensure the highest standard of quality is achieved.
Services Executed:
Control Establishment & Monitoring
Road Alignment and Pier Line Design
Disposal Site Design
Topographical Surveys
Survey Support, Layout & As-builts
Quantities & Volume Tracking
Anchor Bolt Layout & As-builts
Mobile Laboratory Supply
Compaction and Soil Testing
Concrete Testing
Construction Monitoring
AutoCAD Support
Aerial Mapping & Progress Monitoring